AT4 wireless
Home | Sitemap | Search 
 
About Us
Awards and Recognitions
News Room
Events
R&D Projects
Business Units
Search
Customer's Area
 
  News  Press Contact  Subscription  
  Recent  2007  2006 

News

12/12/2007 - AT4 wireless and Sequans collaborate to deliver testing services for Wave 2 Mobile WiMAX™


22/10/2007 - AZIMUTH SYSTEMS PARTNERS WITH AT4 WIRELESS TO BRING CHANNEL EMULATION TO MOBILE WIMAX™ TESTING


21/9/2007 - AT4 wireless provides 2G MINT RF Test Solution to TMC


3/8/2007 - AT4 wireless includes Sanjole´s WaveJudge Wireless Test Equipment to the WiMAX Forum® Lead Laboratory


31/7/2007 - MINT T1152: Ready for HSUPA RF Testing


27/7/2007 - AT4 wireless RIDER RFID Test System Arrives to Korea


24/7/2007 - AT4 wireless obtained Qualification to do testing for the new Wi-Fi CERTIFIED™ 802.11n draft 2.0 program.


20/7/2007 - AT4 wireless offers testing services against the pre-adopted Bluetooth® 2.1 + EDR test specifications


11/7/2007 - WiMAX Forum® and AT4 wireless Announce Availability of New Features on the Spectrum & Regulatory Database


6/7/2007 - AT4 wireless is now 3G approved for PTCRB


20/6/2007 - WiMAX Forum® Designates First North American Based Certification Lab


29/5/2007 - Open-Plug and AT4 wireless cooperate to deliver best-in-class Conformance Testing Services to Handset Makers


9/5/2007 - Taiyo Yuden purchases AT4 wireless BITE Testers with EDR functionality


28/3/2007 - AT4 wireless reaches 1xx countries in Worldwide Type Approvals


22/2/2007 - BITE first BluetoothTM Conformance Test Systems including V2.1+EDR


13/2/2007 - WiMAX Forum® Second Public Mobile PlugFest Showcases Interoperability Among Mobile WiMAX Products


12/2/2007 - Bluetooth PRD2.0 made simple with AT4 wireless


11/2/2007 - AT4 wireless expanding its testing capacity


1/2/2007 - Optimising project management: parallel testing with MiNT


  • The MINT Blocking and Spurious Tester performs long TX tests which are usually performed overnight or without operator.

  • With the MINT Receiver Tester, investment is maximized because most of the project test time is related to RX Test Cases.

  • The MINT Dual Receiver Tester optimises test time and investment, because it performs RX testing of two EUTs in parallel.

  • The MINT TX/RX Parallel Tester is a smart test system that runs a test project in a third of the standard test time.


All these systems are validated reference test platforms for GCF and PTCRB.

Rafael García, Product Manager at CETECOM Spain commented "A bottleneck in certification project management is the RF, where test cases have to be repeated for all supported bands, not like in protocol, audio or SIM. For example, for a standard quad-band 2G project, 480 RF testing hours are required, and 70% of those test cases are receiver tests. AT4 Combines the best of test systems development and laboratory experience and has now provided a solution to optimise project execution: with the MINT Modular Systems we are now able to provide the most complete, advanced and flexible solutions to satisfy all sectors of the mobile communications industry".


 

  Contact AT4 wireless     Legal information Optimized for IE 5 or above - Resolution 800x600 [ versión español ]